1. Deep Digging of the Trench
It is important that you go for deep digging which should be good enough to allow a two inches of sand bed and four inches concrete backfill on each side. This means that you should also check the width so that everything can be accommodated without putting much pressure. Also, it helps in assuring no compromise in getting the quality results.
2. Do Not Use Them as Expansion Joints
It is a mistake that most people do of expecting channels to be used as expansion joints which should be avoided in all cases. It is because concrete slabs can pinch, slip or even sheer them under pressure.
3. Be Alert During Initial Stages
It is very important to be very vigilant during initial stages as final result is very much dependent on initial steps taken. For instance, make sure to do the proper orientation of channel which should be done correctly as it is the basic point which can either make or destroy the results. Similarly, there are multiple channels joined together along with showing the direction of water flow so obviously this step is also very critical to assure the quality results.
4. Remove Protective Tape After Installation
It is important in case of installing one-piece shallow drains where protective tape should not be removed during installation. It may cause strength issues along with some other problems so it is recommended to leave the tape on the grate during installation. Once it is done, you can easily put it off.
5. Must Consider the Timing and Adjacent Temperatures
Though modular shallow drains are highly resistant to chemicals and temperature there are some plastics also involved which suffers a greater magnitude of thermal expansion during installation. This becomes problematic in later stages so it is strictly advised to always consider the time and temperature before you are all up for installation. And also, try to do the complete installation in few days having very slight variation of temperatures which can assure the best and durable results.
6. Use Alternate Methods to Prevent Channel Pinching
You can use plywood boards which are useful for maintaining the shape of channel while pouring concrete solution. Or you can also wrap the trench to secure them before pouring the concrete and you can remove the protective cover once concrete sets. And the best option is using some modular systems which are having installation covers by default. It will help in preventing the filling of concrete solution in channel which results in no pinching during the final concrete pouring.
7. Use Periodic Adapters
It is recommended when setting long runs of shallow drains in which it is good to use periodic down adapters to the underground plumbing. It is because it helps in speedy removal of water without any choking issue. Also, this method is considered as an easiest method for assuring the water in drain pipes is not being idle or running backwards instead it is flowing in correct direction with required speed.